I know this is another simpler one, but I was sort of trying out a technique with this one. To get the soccerball to stay on the clear 1x1 stud I needed to have them upside-down, I also need to have studs on top for the grass. So, Bricks upside-down, plates right-side up. Using These to keep them together.
AND to have the ball going in that arched pattern I needed to have the whole Vig at an angle.